Adams delivered structural and civil engineering services for a three-storey expansion to Kennards Self Storage’s existing Guildford facility. The new building adds 357 storage units across 4,800m² of gross floor area, constructed on a previously contaminated site requiring careful management throughout design and construction.
The structure comprises foundation piles supporting concrete columns and walls, conventional suspended concrete slabs, and a lightweight steel roof. Several existing buildings were demolished to accommodate the expansion.
Contaminated site containment: The existing slab on ground was retained and a new suspended concrete slab constructed above it, capping the contaminated material with minimal soil disturbance, avoiding costly remediation while meeting environmental obligations.
Stormwater management: A custom spoon drain system was designed to manage surface runoff and prevent water ingress from the neighbouring property, a critical consideration given the facility’s operational sensitivity to water damage.
Boundary shoring: A challenging shoring solution was designed along the site boundary to protect the adjoining property during excavation for a localised below-ground storage area.